Sardar Construction Services proudly presents the list of projects with the Multinational companies.

S.no Client Location Structure Type RD Size/Area Year
01 Pakistan Television Corporation Sector H-9 Islamabad Aluminum Partition X X 2016
02 Pakistan Minerals Development Corporation Sector H-9 Islamabad Mosque Fiber Shed X 6500SFT 2016
03 Pakistan Minerals Development Corporation Sector H-9 Islamabad Record Rooms

02

X 24×24 each 2016
04 Federal Government Degree College Rawalpindi Saddar Rawalpindi Tuff paver X 10000SFT 2017
05 Frontier Works Organization CPEC packg-3

Trap to chak Balliyan

Culvert 2+974 km 3mx3m

Single cell

Length: 42m

2017
06 Frontier Works Organization CPEC Packg-3

Hakla to Chak Balliyan

Culvert 1+180 km 3mx3m

03 cells

Length: 81m

2018
07 Frontier Works Organization CPEC packg-3

Trap to Chak Balliyan

Culvert 3+836 km 6mx6m

02 Cells

Length: 41m

Angle:15 degree

2018
08 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan 04 Deck Slaps Bridge 4+770 km Length:30m each 2018
09 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Breast Wall 1+950km

To

2+060km

Length:110m

Height: 3m

2019
10 Frontier Works Organization CPEC Packg-3 Hakla to Chak Balliyan Toe Wall 4+020Km

To

4+320Km

Length:300m Left Side

 

Length:300m Right

 

Height: 2.5m

2019

 

 

 

 

11 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 2+060 Km

To

2+160 Km

Length: 100m

Left Side

 

2020
12 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 1+240 Km

To

1+320 Km

Length:80m

Left Side

 

2020
13 Frontier Works Organization CPEC Packg-3 Hakla to Chak Balliyan Side Drain 3+500 Km

To

3+580 Km

Length:80m

Left Side

 

2020
14 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 3+760 Km

To

3+780 Km

Length:20m

Left Side

 

2020
15 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 3+810 Km

To

3+820 Km

Length:10m

Left Side

 

2020
16 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 3+880 Km

To

4+670 Km

Length:790m

Left Side

 

2020
17 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 3+700 Km

To

3+820 Km

Length:120m

Left Side

 

2020
18 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 4+880 Km

To

4+940 Km

Length:60m

Left Side

 

2020
19 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 5+020 Km

To

5+300 Km

Length:280m

Left Side

 

2020
20 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 7+340 Km

To

7+580 Km

Length:240m

Left Side

 

2020
21 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 7+360 Km

To

7+580 Km

Length:220m

Right Side

 

2020
22 Frontier Works Organization CPEC Packg-3 Trap to Chak Balliyan Side Drain 9+040 Km

To

9+380 Km

Length:340m

Left Side

 

Length:340m

Right Side

 

 

2020
23 Frontier Works Organization CPEC Pakg-3

Trap to Chak Balliyan

Toe Wall 3+900 Km

To

4+020 Km

Length: 120m

Left Side

2020

AGGREGATE MATERIAL 

S.no Client Year
1 Defense Housing Authority (Habib Rafique Limited) 2005-2006
2 Pakistan secretariat (Redco) 2006-2008
3 Islamabad International Airport 2007-20011
4 Bahria Enclave (habib Construction Services) 2011-2013
5 Metro Rawalpindi-Islamabad (Habib Construction services) 2014
6 Mandra Chakwal road 2014-2015
7 CEPEC package Lahore to Toba tak Singh (China Railway First Group 20 )
8 Metro Islamabad sector G-9 to Peshawar Mor (Ajj construction) 2017
9 Lower Toppa Murree Road (Habib Construction Services) 2018
10 FEGHF High Rise Flats G-13/1 (Ghulam Habib Construction) 2019

170

Completed Projects

13

Qualified Engineers

140+

Technical Staff

100+

Material Supplied to